Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Installation of a Seepage Cutoff Wall at the Herbert Hoover Dike Using the Cutter Soil Mixing Method
Installation of a Seepage Cutoff Wall at the Herbert Hoover Dike Using the Cutter Soil Mixing Method
Installation of a Seepage Cutoff Wall at the Herbert Hoover Dike Using the Cutter Soil Mixing Method
Schauer, D.A. (Autor:in) / Mevers, D.A. (Autor:in) / Puccini, C.J. (Autor:in) / Johnsen, Larry / Bruce, Donald A. / Byle, Michael J. / Deep Foundations Institute / American Society of Civil Engineers
International conference; 4th, Grouting and deep conference ; 2012 ; New Orleans, LA
01.01.2012
12 pages
"The three previous conferences were held [in] 1982, 1992, and in 2003"--P. iv. 1982 conference name was: Conference on Grouting in Geotechnical Engineering. 1992 conference name was: Specialty Conference on Grouting, Soil Improvement and Geosynthetics. 2003 conference name was: Specialty Conference on Grouting. Includes bibliographical references and indexes.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Herbert Hoover Dike: Major Rehabilitation
British Library Conference Proceedings | 2006
|Herbert Hoover Dike: Major Rehabilitation
British Library Conference Proceedings | 2007
|Cutoff Wall Construction by the Self-Hardening Slurry Method at the Herbert Hoover Dike, FL
British Library Conference Proceedings | 2010
|Baseline Risk Assessment for Herbert Hoover Dike
British Library Conference Proceedings | 2011
|