Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Estimation of Excavation Disturbed Zone of High Slope in the Left Bank of Jinping-I Hydropower Station
Estimation of Excavation Disturbed Zone of High Slope in the Left Bank of Jinping-I Hydropower Station
Estimation of Excavation Disturbed Zone of High Slope in the Left Bank of Jinping-I Hydropower Station
Peng, J. (Autor:in) / Rong, G. (Autor:in) / Li, Z.L. (Autor:in) / Jiang, Changbo / Yang, Zhaohui Joey
International conference, Civil, architectural and hydraulic engineering ; 2012 ; Zhangjiajie, China
01.01.2012
6 pages
Based on those presented at the conference. Includes bibliographical references and index.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Trans Tech Publications | 2012
|Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station
British Library Online Contents | 2004
|Long-term stability analysis of the left bank abutment slope at Jinping I hydropower station
DOAJ | 2016
|Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station
Online Contents | 2004
|