A platform for research: civil engineering, architecture and urbanism
Estimation of Excavation Disturbed Zone of High Slope in the Left Bank of Jinping-I Hydropower Station
Estimation of Excavation Disturbed Zone of High Slope in the Left Bank of Jinping-I Hydropower Station
Estimation of Excavation Disturbed Zone of High Slope in the Left Bank of Jinping-I Hydropower Station
Peng, J. (author) / Rong, G. (author) / Li, Z.L. (author) / Jiang, Changbo / Yang, Zhaohui Joey
International conference, Civil, architectural and hydraulic engineering ; 2012 ; Zhangjiajie, China
2012-01-01
6 pages
Based on those presented at the conference. Includes bibliographical references and index.
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Trans Tech Publications | 2012
|Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station
British Library Online Contents | 2004
|Long-term stability analysis of the left bank abutment slope at Jinping I hydropower station
DOAJ | 2016
|Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station
Online Contents | 2004
|