Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Construction Technology of Segmented Parallel Operations in Main Shaft No. 2, Wutong Coal Mine
The Construction Technology of Segmented Parallel Operations in Main Shaft No. 2, Wutong Coal Mine
The Construction Technology of Segmented Parallel Operations in Main Shaft No. 2, Wutong Coal Mine
Zhao, P.F. (Autor:in) / Wang, Y.B. (Autor:in) / Zhang, Y.F. (Autor:in) / Guo, D.M. (Autor:in) / Zhang, Xiangdong / Li, Hongnan / Feng, Xiating
International conference; 2nd, Civil engineering and transportation; Advances in civil engineering II: selected, peer reviewed papers from the 2nd international conference (ICCET 2012), October 27-28 2012, Guilin, China / ; 2012 ; Guilin, China
01.01.2012
7 pages
Includes bibliographical references and index.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Waste coal mine main shaft tower protection transformation method
Europäisches Patentamt | 2020
|Waste coal mine main shaft protection and transformation method
Europäisches Patentamt | 2021
|Sinking coal-mine ventilating shaft
Engineering Index Backfile | 1937
|Engineering Index Backfile | 1911
|