A platform for research: civil engineering, architecture and urbanism
The Construction Technology of Segmented Parallel Operations in Main Shaft No. 2, Wutong Coal Mine
The Construction Technology of Segmented Parallel Operations in Main Shaft No. 2, Wutong Coal Mine
The Construction Technology of Segmented Parallel Operations in Main Shaft No. 2, Wutong Coal Mine
Zhao, P.F. (author) / Wang, Y.B. (author) / Zhang, Y.F. (author) / Guo, D.M. (author) / Zhang, Xiangdong / Li, Hongnan / Feng, Xiating
International conference; 2nd, Civil engineering and transportation; Advances in civil engineering II: selected, peer reviewed papers from the 2nd international conference (ICCET 2012), October 27-28 2012, Guilin, China / ; 2012 ; Guilin, China
2012-01-01
7 pages
Includes bibliographical references and index.
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Waste coal mine main shaft tower protection transformation method
European Patent Office | 2020
|Waste coal mine main shaft protection and transformation method
European Patent Office | 2021
|Sinking coal-mine ventilating shaft
Engineering Index Backfile | 1937
|Engineering Index Backfile | 1911
|