Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Qiansimen Birdge - Partial Cable-Stayed Bridge with Steel Truss Girder
Construction of Qiansimen Birdge - Partial Cable-Stayed Bridge with Steel Truss Girder
Construction of Qiansimen Birdge - Partial Cable-Stayed Bridge with Steel Truss Girder
Zhang, Y.T. (Autor:in) / Du, S. (Autor:in) / You, X.P. (Autor:in) / Peng, C.M. (Autor:in) / Yang, Weijun / Liang, Jianguo
International conference; 2nd, Civil, architectural and hydraulic engineering ; 2013 ; Zhuhai, China
Civil, architectural and hydraulic engineering ; 3113-3118
APPLIED MECHANICS AND MATERIALS ; 405/408
01.01.2013
6 pages
Includes bibliographical references and index.
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction of Qiansimen Birdge - Partial Cable-Stayed Bridge with Steel Truss Girder
Trans Tech Publications | 2013
|Steel truss girder cable-stayed bridge vertical rotation construction method
Europäisches Patentamt | 2023
|Modularized steel truss girder cable-stayed bridge girder erection crane
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Steel truss girder cable-stayed bridge initial internode installation mode
Europäisches Patentamt | 2021
|