Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction methodology and geotechnical problems encountered and remedial measures adopted during construction of surge shaft of Rangit Hydroelectric Project: South Sikkim
Construction methodology and geotechnical problems encountered and remedial measures adopted during construction of surge shaft of Rangit Hydroelectric Project: South Sikkim
Construction methodology and geotechnical problems encountered and remedial measures adopted during construction of surge shaft of Rangit Hydroelectric Project: South Sikkim
Madan, M. M. (Autor:in) / Basu, M. (Autor:in) / Sanyal, S. (Autor:in)
INDIAN JOURNAL OF POWER AND RIVER VALLEY DEVELOPMENT ; 45 ; 153-167
01.01.1995
15 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
627
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2005
|Construction Report: Construction methodology of surge shaft
Online Contents | 2003
|Rio Dam Hydroelectric Project Stability Investigation, Remedial Design and Construction
British Library Conference Proceedings | 1997
|Some Problems Encountered In The Design And Construction Of Hydroelectric Projects
British Library Conference Proceedings | 1993
|Geotechnical problems encountered in construction of subway tunnel from Jernbanetorvet to Toyen
Engineering Index Backfile | 1966
|