A platform for research: civil engineering, architecture and urbanism
Construction methodology and geotechnical problems encountered and remedial measures adopted during construction of surge shaft of Rangit Hydroelectric Project: South Sikkim
Construction methodology and geotechnical problems encountered and remedial measures adopted during construction of surge shaft of Rangit Hydroelectric Project: South Sikkim
Construction methodology and geotechnical problems encountered and remedial measures adopted during construction of surge shaft of Rangit Hydroelectric Project: South Sikkim
Madan, M. M. (author) / Basu, M. (author) / Sanyal, S. (author)
INDIAN JOURNAL OF POWER AND RIVER VALLEY DEVELOPMENT ; 45 ; 153-167
1995-01-01
15 pages
Article (Journal)
English
DDC:
627
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2005
|Construction Report: Construction methodology of surge shaft
Online Contents | 2003
|Rio Dam Hydroelectric Project Stability Investigation, Remedial Design and Construction
British Library Conference Proceedings | 1997
|Some Problems Encountered In The Design And Construction Of Hydroelectric Projects
British Library Conference Proceedings | 1993
|Tunnel and Shaft Construction at the Wahleach Hydroelectric Project
British Library Conference Proceedings | 1992
|