Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Just-in-time demands put pressure on concrete supply and consistency
Just-in-time demands put pressure on concrete supply and consistency
Just-in-time demands put pressure on concrete supply and consistency
Harvey, D. (Autor:in)
CONCRETE -LONDON- CONCRETE SOCIETY- ; 40 ; 16-17
01.01.2006
2 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
693
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
CONCRETE ON SITE - Just-in-time demands put pressure on concrete supply and consistency
Online Contents | 2006
|Consistency and time in mixing concrete
Engineering Index Backfile | 1912
|Precasting Concrete just in Time
Online Contents | 1994
|Just-In-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain Integration
British Library Conference Proceedings | 1999
|Precasting Concrete just in Time
British Library Online Contents | 1994
|