Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONCRETE ON SITE - Just-in-time demands put pressure on concrete supply and consistency
CONCRETE ON SITE - Just-in-time demands put pressure on concrete supply and consistency
CONCRETE ON SITE - Just-in-time demands put pressure on concrete supply and consistency
Harvey, David (Autor:in)
Concrete ; 40
2006
Aufsatz (Zeitschrift)
Englisch
Lokalklassifikation TIB:
275/6400/6500
BKL:
56.12
Betonbau
Just-in-time demands put pressure on concrete supply and consistency
British Library Online Contents | 2006
|Precasting Concrete just in Time
Online Contents | 1994
|Precasting Concrete just in Time
British Library Online Contents | 1994
|Consistency and time in mixing concrete
Engineering Index Backfile | 1912
|Measuring consistency of concrete
Engineering Index Backfile | 1964
|