Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Time-cost model for building projects in Nigeria
Time-cost model for building projects in Nigeria
Time-cost model for building projects in Nigeria
Ogunsemi, D. R. (Autor:in) / Jagboro, G. O. (Autor:in)
CONSTRUCTION MANAGEMENT AND ECONOMICS ; 24 ; 253-258
01.01.2006
6 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
338.47624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Time‐cost model for building projects in Nigeria
Online Contents | 2006
|Time‐cost model for building projects in Nigeria
Online Contents | 2006
|Application of Browmilow’s Time-Cost (BTC) Model to Highway Projects in Nigeria
BASE | 2014
|Application of Browmilow’s Time-Cost (BTC) Model to Highway Projects in Nigeria
DOAJ | 2014
|An investigation into cost overruns for ongoing building projects in Abuja, Nigeria
BASE | 2017
|