Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Time‐cost model for building projects in Nigeria
Time‐cost model for building projects in Nigeria
Time‐cost model for building projects in Nigeria
Ogunsemi, D.R. (Autor:in) / Jagboro, G.O.
2006
Aufsatz (Zeitschrift)
Unbekannt
Lokalklassifikation TIB:
275/1935/6500
BKL:
56.00
/
56.00
Bauwesen: Allgemeines
Time-cost model for building projects in Nigeria
British Library Online Contents | 2006
|Time‐cost model for building projects in Nigeria
Online Contents | 2006
|Application of Browmilow’s Time-Cost (BTC) Model to Highway Projects in Nigeria
BASE | 2014
|Application of Browmilow’s Time-Cost (BTC) Model to Highway Projects in Nigeria
DOAJ | 2014
|An investigation into cost overruns for ongoing building projects in Abuja, Nigeria
BASE | 2017
|