Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Minimising Risks through complex Groundwater Management for the Amsterdam North/South Line
TUNNEL -GUTERSLOH- ; 24-31
01.01.2011
8 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624.193
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Monitoring of the North-South Metro line in Amsterdam (3)
British Library Conference Proceedings | 2003
|Grouted strut design for deep station boxes, north-south line Amsterdam
British Library Conference Proceedings | 2008
|Minimising Underground Construction Risks Requires Maximum Engineering Effort
British Library Online Contents | 1998
|Soil grouting: Full scale injection test North/South Metro Line Amsterdam
British Library Conference Proceedings | 1998
|The high speed railway line Brussels-Amsterdam-Antwerp north-south link
British Library Conference Proceedings | 2003
|