A platform for research: civil engineering, architecture and urbanism
Minimising Risks through complex Groundwater Management for the Amsterdam North/South Line
TUNNEL -GUTERSLOH- ; 24-31
2011-01-01
8 pages
Article (Journal)
English
DDC:
624.193
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Monitoring of the North-South Metro line in Amsterdam (3)
British Library Conference Proceedings | 2003
|Minimising Underground Construction Risks Requires Maximum Engineering Effort
British Library Online Contents | 1998
|Grouted strut design for deep station boxes, north-south line Amsterdam
British Library Conference Proceedings | 2008
|The high speed railway line Brussels-Amsterdam-Antwerp north-south link
British Library Conference Proceedings | 2003
|Soil grouting: Full scale injection test North/South Metro Line Amsterdam
British Library Conference Proceedings | 1998
|