Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Case study: Risk analysis by overtopping of diversion works during dam construction: The La Yesca hydroelectric project, Mexico
Case study: Risk analysis by overtopping of diversion works during dam construction: The La Yesca hydroelectric project, Mexico
Case study: Risk analysis by overtopping of diversion works during dam construction: The La Yesca hydroelectric project, Mexico
Marengo, H. (Autor:in) / Arreguin, F. I. (Autor:in) / Aldama, A. A. (Autor:in) / Morales, V. (Autor:in)
STRUCTURAL SAFETY ; 42 ; 26-34
01.01.2013
9 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624.17
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 2006
|Construction of Diversion Tunnel for Doyang Hydroelectric Project - A Case Study
British Library Conference Proceedings | 2000
|