Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Parambikulam-Aliyar Project Operations Optimization with Reliability Constraints
Parambikulam-Aliyar Project Operations Optimization with Reliability Constraints
Parambikulam-Aliyar Project Operations Optimization with Reliability Constraints
Mahootchi, M. (Autor:in) / Ponnambalam, K. (Autor:in)
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT ; 139 ; 364-375
01.01.2013
12 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
333.91
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Parambikulam-Aliyar Project Operations Optimization with Reliability Constraints
Online Contents | 2013
|Experiences in System Reliability Optimization Including Damage Constraints
Springer Verlag | 1992
|Non-parametric stochastic subset optimization for design problems with reliability constraints
British Library Online Contents | 2015
|Multi-project Time-cost Optimization in Critical Chain with Resource Constraints
Online Contents | 2018
|