Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis
Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis
Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis
Gelisen, G. (Autor:in) / Griffis, F.H. (Autor:in)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 140 ; B4013007
01.01.2014
B4013007
Aufsatz (Zeitschrift)
Englisch
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Automated BIM schedule generation approach for solving time–cost trade-off problems
Emerald Group Publishing | 2021
|Animation-based construction schedule review
Emerald Group Publishing | 2001
|Convex-hull algorithm for construction schedule time/cost trade-off decision
British Library Conference Proceedings | 1995
|