Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Optimized Group Replacement Scheduling for Water Pipeline Network
Optimized Group Replacement Scheduling for Water Pipeline Network
Optimized Group Replacement Scheduling for Water Pipeline Network
Li, Fengfeng (Autor:in) / Ma, Lin (Autor:in) / Sun, Yong (Autor:in) / Mathew, Joseph (Autor:in)
Journal of water resources planning and management ; 142 ; 04015035-04015035
01.01.2016
1 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
333.91
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Optimized Group Replacement Scheduling for Water Pipeline Network
Online Contents | 2016
|Optimal Scheduling of Replacement and Rehabilitation in Wastewater Pipeline Networks
British Library Online Contents | 2010
|Optimal Scheduling of Replacement and Rehabilitation in Wastewater Pipeline Networks
Online Contents | 2010
|Criteria for Pipeline Replacement
Wiley | 1978
|