A platform for research: civil engineering, architecture and urbanism
Optimized Group Replacement Scheduling for Water Pipeline Network
Optimized Group Replacement Scheduling for Water Pipeline Network
Optimized Group Replacement Scheduling for Water Pipeline Network
Li, Fengfeng (author) / Ma, Lin (author) / Sun, Yong (author) / Mathew, Joseph (author)
Journal of water resources planning and management ; 142 ; 04015035-04015035
2016-01-01
1 pages
Article (Journal)
English
DDC:
333.91
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Optimized Group Replacement Scheduling for Water Pipeline Network
Online Contents | 2016
|Optimal Scheduling of Replacement and Rehabilitation in Wastewater Pipeline Networks
British Library Online Contents | 2010
|Optimal Scheduling of Replacement and Rehabilitation in Wastewater Pipeline Networks
Online Contents | 2010
|Criteria for Pipeline Replacement
Wiley | 1978
|