Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Supply chain cost model for prefabricated building material based on time-driven activity-based costing
Supply chain cost model for prefabricated building material based on time-driven activity-based costing
Supply chain cost model for prefabricated building material based on time-driven activity-based costing
Kim, Yong-Woo (Autor:in) / Han, Seung-Heon (Autor:in) / Yi, June-Seong (Autor:in) / Chang, SooWon (Autor:in)
Canadian journal of civil engineering ; 43 ; 287-293
01.01.2016
7 pages
Aufsatz (Zeitschrift)
Unbekannt
DDC:
624.05
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Analisis Cost-To-Serve Dan Customer Profitability Dengan Time-Driven Activity-Based Costing
DOAJ | 2020
|Implementation of time-driven activity-based costing in weaving service company
BASE | 2020
|Supply Chain Management and Management Accounting: A Case Study of Activity-Based Costing
British Library Online Contents | 2000
|