Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Space-Time Repetitive Project Scheduling Considering Location and Congestion
Space-Time Repetitive Project Scheduling Considering Location and Congestion
Space-Time Repetitive Project Scheduling Considering Location and Congestion
Tao, Sha (Autor:in) / Wu, Changzhi (Autor:in) / Sheng, Zhaohan (Autor:in) / Wang, Xiangyu (Autor:in)
Journal of computing in civil engineering ; 32 ; 04018017-04018017
01.01.2018
1 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624.0285
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Work continuity constraints in repetitive project scheduling considering soft logic
Emerald Group Publishing | 2020
|Scenario‐oriented repetitive project scheduling optimization
Wiley | 2023
|Time-cost optimization in repetitive project scheduling with limited resources
Emerald Group Publishing | 2021
|Repetitive Project Scheduling for Large Scale Residential Housing
British Library Conference Proceedings | 1997
|