A platform for research: civil engineering, architecture and urbanism
Space-Time Repetitive Project Scheduling Considering Location and Congestion
Space-Time Repetitive Project Scheduling Considering Location and Congestion
Space-Time Repetitive Project Scheduling Considering Location and Congestion
Tao, Sha (author) / Wu, Changzhi (author) / Sheng, Zhaohan (author) / Wang, Xiangyu (author)
Journal of computing in civil engineering ; 32 ; 04018017-04018017
2018-01-01
1 pages
Article (Journal)
English
DDC:
624.0285
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Work continuity constraints in repetitive project scheduling considering soft logic
Emerald Group Publishing | 2020
|Scenario‐oriented repetitive project scheduling optimization
Wiley | 2023
|Time-cost optimization in repetitive project scheduling with limited resources
Emerald Group Publishing | 2021
|Repetitive Project Scheduling for Large Scale Residential Housing
British Library Conference Proceedings | 1997
|