Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Time-cost tradeoff analysis with minimized project financing cost
Time-cost tradeoff analysis with minimized project financing cost
Time-cost tradeoff analysis with minimized project financing cost
Alavipour, S.M. Reza (Autor:in) / Arditi, David (Autor:in)
Automation in construction ; 98 ; 110-121
01.01.2019
12 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
629.8
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
New Aspects in Time-Cost Tradeoff Analysis
ASCE | 2013
|New Aspects in Time-Cost Tradeoff Analysis
Online Contents | 2015
|Flexible Model for Time/Cost Tradeoff Problem
British Library Online Contents | 2004
|