Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
History of geologic investigations, engineering design, and construction methods of the Harold D. Roberts Tunnel, Colorado : a historical review of the planning, geologic investigations, engineering design, and construction procedures for a 23.3-mile water tunnel that passes under the Continental Divide in the Front Range of Colorado
History of geologic investigations, engineering design, and construction methods of the Harold D. Roberts Tunnel, Colorado : a historical review of the planning, geologic investigations, engineering design, and construction procedures for a 23.3-mile water tunnel that passes under the Continental Divide in the Front Range of Colorado
History of geologic investigations, engineering design, and construction methods of the Harold D. Roberts Tunnel, Colorado : a historical review of the planning, geologic investigations, engineering design, and construction procedures for a 23.3-mile water tunnel that passes under the Continental Divide in the Front Range of Colorado
Wahlstrom, Ernest Eugene (Autor:in)
1974
III, 13 S
5 Kt.-Beil.
Ill., graph. Darst., Kt
Part of illustrative matter in pocket
Bibliography: p. 13
Buch
Englisch
DDC:
624/.192/0978845
Investigations, design and starting of construction, Continental divide tunnel
Engineering Index Backfile | 1941
|Engineering geologic mapping and potential geologic hazards in Colorado
Online Contents | 1980
|Engineering geologic mapping and potential geologic hazards in Colorado
Online Contents | 1980
|Geologic research at straight creek tunnel site, Colorado
Engineering Index Backfile | 1964
|