Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Optimal Analysis of Construction Schemes for Tuanshan Small Clear-Distance Tunnel
Optimal Analysis of Construction Schemes for Tuanshan Small Clear-Distance Tunnel
Optimal Analysis of Construction Schemes for Tuanshan Small Clear-Distance Tunnel
SHEN, MeiFang (Autor:in) / DUAN, JunChao (Autor:in) / WU, XianGuo (Autor:in)
2017
Aufsatz (Konferenz)
Englisch
Europäisches Patentamt | 2024
|Anti-interference construction method for small-clear-distance bridge and tunnel combined structure
Europäisches Patentamt | 2024
|Rapid construction method for open-cut variable-cross-section small-clear-distance tunnel group
Europäisches Patentamt | 2024
|Influence of Small, Clear Distance Cross-Tunnel Blasting Excavation on Existing Tunnel below
DOAJ | 2019
|DOAJ | 2023
|