Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cost-Time Model for Large CPM Project Networks
A simple and efficient algorithm for hand computations or computer solutions is presented for developing cost-time trade-off curves for CPM project networks. The use of such curves, whose importance as project management tools increases with network size, has been hampered by two factors: the shape of cost-time relationships for the project's activities and the excessive computational costs for large networks. This algorithm is especially designed to cope with the above difficulties. All large engineering project networks can be decomposed into nonoverlapping segments so structured that their cost-time curve can be computed efficiently. Replacement of these segments by equivalent arcs drastically reduces the network either to a single arc, whose cost-time curve is the project-cost curve for the original network, or to a small nondecomposable form whereupon other existing schemes can be employed.
Cost-Time Model for Large CPM Project Networks
A simple and efficient algorithm for hand computations or computer solutions is presented for developing cost-time trade-off curves for CPM project networks. The use of such curves, whose importance as project management tools increases with network size, has been hampered by two factors: the shape of cost-time relationships for the project's activities and the excessive computational costs for large networks. This algorithm is especially designed to cope with the above difficulties. All large engineering project networks can be decomposed into nonoverlapping segments so structured that their cost-time curve can be computed efficiently. Replacement of these segments by equivalent arcs drastically reduces the network either to a single arc, whose cost-time curve is the project-cost curve for the original network, or to a small nondecomposable form whereupon other existing schemes can be employed.
Cost-Time Model for Large CPM Project Networks
Panagiotakopoulos, Demetrios (Autor:in)
Journal of the Construction Division ; 103 ; 201-211
01.01.2021
111977-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Project cost-time optimal solutions
British Library Conference Proceedings | 2002
|Cost and Time Scaled Networks: Graphical Model
ASCE | 2021
|Time-cost tradeoff analysis with minimized project financing cost
British Library Online Contents | 2019
|Cushman project provides large storage at low cost
Engineering Index Backfile | 1927
|Dynamic Programming for Project Cost-Time Curves
ASCE | 2021
|