Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Public Works Capacity Expansion Based on Unit Cost
A procedure is presented for determining the capacity design time that results in the lowest unit cost to the user of a public works facility or project. It was found that the higher the rate of population growth in the utility service area, the shorter the appropriate capacity design time. The period of time over which bonds used to finance the project were amortized was found to have a substantial influence on the unit cost to the customer. The procedure is applicable only to the design of the public works projects financed by the sale of long-term bonds.
Public Works Capacity Expansion Based on Unit Cost
A procedure is presented for determining the capacity design time that results in the lowest unit cost to the user of a public works facility or project. It was found that the higher the rate of population growth in the utility service area, the shorter the appropriate capacity design time. The period of time over which bonds used to finance the project were amortized was found to have a substantial influence on the unit cost to the customer. The procedure is applicable only to the design of the public works projects financed by the sale of long-term bonds.
Public Works Capacity Expansion Based on Unit Cost
Harrison, Carter (Autor:in)
Journal of the Hydraulics Division ; 100 ; 1707-1715
01.01.2021
91974-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Housing and public works and factors affecting their cost
Engineering Index Backfile | 1953
|Taylor & Francis Verlag | 2008
|Engineering Index Backfile | 1888
|Engineering Index Backfile | 1886
Engineering Index Backfile | 1943
|