Guidance to Safety-Centric Construction Acceleration Planning in the Context of Project Time-Cost Tradeoff Analysis
The time-cost tradeoff (TCT) analysis is intended to expedite critical activity times and total project duration, possibly resulting in more hazardous situations and more safety risks than the normal case. On the other hand, safety-centric construction acceleration planning is complicated and challenging as a result of dynamic work settings, rotation of various work teams, exposure to changing weather conditions, and employing higher proportions of inexperienced workers. In connection with TCT theory, this study is aimed to assist construction planners in implementing safety-centric planning for resource use, time, and cost at critical activities. In order to guide construction acceleration planning while minimizing safety hazards and preventing accidents, this research consulted published literature, investigated best practices, and referenced regulations related to occupational health and safety. The research deliverable includes compilation of significant factors and generalization of a set of rules for facilitating construction acceleration planning and enabling the follow-up TCT analysis.
Guidance to Safety-Centric Construction Acceleration Planning in the Context of Project Time-Cost Tradeoff Analysis
The time-cost tradeoff (TCT) analysis is intended to expedite critical activity times and total project duration, possibly resulting in more hazardous situations and more safety risks than the normal case. On the other hand, safety-centric construction acceleration planning is complicated and challenging as a result of dynamic work settings, rotation of various work teams, exposure to changing weather conditions, and employing higher proportions of inexperienced workers. In connection with TCT theory, this study is aimed to assist construction planners in implementing safety-centric planning for resource use, time, and cost at critical activities. In order to guide construction acceleration planning while minimizing safety hazards and preventing accidents, this research consulted published literature, investigated best practices, and referenced regulations related to occupational health and safety. The research deliverable includes compilation of significant factors and generalization of a set of rules for facilitating construction acceleration planning and enabling the follow-up TCT analysis.
Guidance to Safety-Centric Construction Acceleration Planning in the Context of Project Time-Cost Tradeoff Analysis
Mahdavian, Samin (Autor:in) / Bellale Manjunatha, Kumar Subramanian (Autor:in) / Pereira, Estacio (Autor:in) / Lu, Ming (Autor:in)
Construction Research Congress 2020 ; 2020 ; Tempe, Arizona
Construction Research Congress 2020 ; 1186-1193
09.11.2020
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Application framework for safety-centric construction acceleration planning
Emerald Group Publishing | 2022
|Resilience-cost tradeoff supply chain planning for the prefabricated construction project
BASE | 2021
|Resilience-cost tradeoff supply chain planning for the prefabricated construction project
DOAJ | 2021
|Time-cost tradeoff analysis with minimized project financing cost
British Library Online Contents | 2019
|Path-Float Based Approach to Optimizing Time-Cost Tradeoff in Project Planning and Scheduling
British Library Conference Proceedings | 2019
|