Construction Methods for Rogers Pass Tunnel
This paper describes the construction of the Rogers Pass Tunnel, on the Canadian Pacific Railway, through the Selkirk Range, in British Columbia. The principal feature of the paper is the description of the pioneer, or auxiliary heading, method of construction, by which: adequate ventilation of the headings was secured; the removal of the muck was facilitated; the water, air, and ventilation pipes were not subject to disturbance; it was possible to expedite the work of enlargement of the main heading; a route for men, tools, and materials was provided; and the ventilation pipes were carried around the drilling, blasting, and mucking operations in the main tunnel, thus preventing delays due to gas and smoke. The “pioneer heading” appears to have justified its use for this tunnel.
Construction Methods for Rogers Pass Tunnel
This paper describes the construction of the Rogers Pass Tunnel, on the Canadian Pacific Railway, through the Selkirk Range, in British Columbia. The principal feature of the paper is the description of the pioneer, or auxiliary heading, method of construction, by which: adequate ventilation of the headings was secured; the removal of the muck was facilitated; the water, air, and ventilation pipes were not subject to disturbance; it was possible to expedite the work of enlargement of the main heading; a route for men, tools, and materials was provided; and the ventilation pipes were carried around the drilling, blasting, and mucking operations in the main tunnel, thus preventing delays due to gas and smoke. The “pioneer heading” appears to have justified its use for this tunnel.
Construction Methods for Rogers Pass Tunnel
Dennis, A. C. (Autor:in)
Transactions of the American Society of Civil Engineers ; 81 ; 448-470
01.01.2021
231917-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Construction methods for rogers pass tunnel
Engineering Index Backfile | 1917
Construction methods for rogers pass tunnel
Engineering Index Backfile | 1917
|Construction methods for rogers pass tunnel
Engineering Index Backfile | 1917
Methods adopted in the construction of Rogers Pass tunnel
Engineering Index Backfile | 1916
|Rogers pass tunnel—bore and blast
Elsevier | 1987
|