Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Calculation Method for the Socketed Length of the Rock Socketed Pile by the Settlement of the Pile Top
The load transferring mechanism was investigated and then used to establish the load transferring equation. A calculation method for the vertical load transferring characteristic of the rock socketed pile was proposed to make up for the deficiency of that method in current norms. This method can derive not only the expression of the socketed length of pile, but also the load sharing ratio at the pile tip. Case histories were used to observe the variation of the socketed length and the load sharing ratio at the pile tip over the settlement at the pile top. The results indicate that the required socketed length increases as the settlement requirement at the pile top decreases. The larger the settlement at the pile top, the higher the load sharing ratio at the pile tip. The increment of the socketed length ratio results in the descent of the bearing ratio of the pile tip resistance when other conditions remain unchanged. The method can determine the socketed length of the pile both safely and economically by considering the settlement required by the upper structure and the load sharing ratio at the pile tip.
Calculation Method for the Socketed Length of the Rock Socketed Pile by the Settlement of the Pile Top
The load transferring mechanism was investigated and then used to establish the load transferring equation. A calculation method for the vertical load transferring characteristic of the rock socketed pile was proposed to make up for the deficiency of that method in current norms. This method can derive not only the expression of the socketed length of pile, but also the load sharing ratio at the pile tip. Case histories were used to observe the variation of the socketed length and the load sharing ratio at the pile tip over the settlement at the pile top. The results indicate that the required socketed length increases as the settlement requirement at the pile top decreases. The larger the settlement at the pile top, the higher the load sharing ratio at the pile tip. The increment of the socketed length ratio results in the descent of the bearing ratio of the pile tip resistance when other conditions remain unchanged. The method can determine the socketed length of the pile both safely and economically by considering the settlement required by the upper structure and the load sharing ratio at the pile tip.
Calculation Method for the Socketed Length of the Rock Socketed Pile by the Settlement of the Pile Top
Lei, Yong (Autor:in) / Zhao, Minghua (Autor:in) / Ma, Binhui (Autor:in)
15.08.2012
72012-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Rock-socketed hollow precast pile and rock-socketed construction method using precast pile
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|A simplified model for single pile settlement calculation of rock-socketed piles
Tema Archiv | 1999
|Model Test of Socketed Depth's Influence on Bearing Mechanism in Rock-Socketed Pile
British Library Conference Proceedings | 2011
|