Port of Anacortes Former Scott Paper Mill Clean-Up: Innovative Solution and Challenges
The Port of Anacortes, Washington is working on implementation of a complex clean-up project that includes excavation and dredging of contaminated sediment, capping the remaining sediment, constructing the detached attenuator, removing the old Port breakwater, and constructing a habitat and a pier for recreational activities. The complexity of the clean-up project is exacerbated by intense wave action and ongoing shoreline and bottom slope erosion. In order to determine a technically feasible and environmentally acceptable engineering solution for the clean-up project, the Port completed a comprehensive coastal engineering study that included extensive numerical modeling to evaluate wave action, tidal flow, and sediment stability. Based on results of the study, an optimal solution was found; preliminary and final engineering were completed; and environmental clearances were obtained. Project construction started in July 2009 and is scheduled for completion in March 2010.
Port of Anacortes Former Scott Paper Mill Clean-Up: Innovative Solution and Challenges
The Port of Anacortes, Washington is working on implementation of a complex clean-up project that includes excavation and dredging of contaminated sediment, capping the remaining sediment, constructing the detached attenuator, removing the old Port breakwater, and constructing a habitat and a pier for recreational activities. The complexity of the clean-up project is exacerbated by intense wave action and ongoing shoreline and bottom slope erosion. In order to determine a technically feasible and environmentally acceptable engineering solution for the clean-up project, the Port completed a comprehensive coastal engineering study that included extensive numerical modeling to evaluate wave action, tidal flow, and sediment stability. Based on results of the study, an optimal solution was found; preliminary and final engineering were completed; and environmental clearances were obtained. Project construction started in July 2009 and is scheduled for completion in March 2010.
Port of Anacortes Former Scott Paper Mill Clean-Up: Innovative Solution and Challenges
Elsner, Bob (Autor:in) / Shepsis, Vladimir (Autor:in) / Phillips, Shane (Autor:in) / Herzog, John (Autor:in)
12th Triannual International Conference on Ports ; 2010 ; Jacksonville, Florida, United States
Ports 2010 ; 173-182
22.04.2010
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Waterways , Innovation , Harbors , Design , Washington , Sediment , Coastal management , Marine terminals , Dredging
Port of Anacortes Former Scott Paper Mill Clean-Up: Innovative Solution and Challenges
British Library Conference Proceedings | 2010
|New paper mill at Port Arthur, Ont
Engineering Index Backfile | 1928
|Scott explores multi-component business with rxt Former key man in PGS and GECO, Mike Scott
British Library Online Contents | 2004
|