Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Port of Anacortes Former Scott Paper Mill Cleanup Project
A complex cleanup project that included dredging and capping of contaminated sediment, construction of two breakwaters, habitat enhancement, upgrade of a seasonal small craft facility and installation of new aids to navigation was completed by the Port of Anacortes, Washington in collaboration with the Department of Ecology, Washington and PRP. The complexity of project site physical processes, extent of dredging, and strict regulatory requirements on the clean-up action necessitated an innovative engineering approach to all above elements of the project. The approach also included application of the most advanced coastal engineering modeling tools including wave, tidal flow, sediment transport and stability, and coastal geomorphology hydrodynamic simulators. Based on analysis of the numerical modeling results, optimal engineering decisions were made for design and construction of detached breakwaters, dredging and removing a portion of the contaminated sediment, capping of the remaining contaminated sediment, and removing the old deteriorating creosoted sheetpile wall breakwater. Also, the results of the study determined the possibility of creating a sheltered eelgrass habitat and year-round small craft facility for different types of activities such as fishing, kayaking, and sailing.
Port of Anacortes Former Scott Paper Mill Cleanup Project
A complex cleanup project that included dredging and capping of contaminated sediment, construction of two breakwaters, habitat enhancement, upgrade of a seasonal small craft facility and installation of new aids to navigation was completed by the Port of Anacortes, Washington in collaboration with the Department of Ecology, Washington and PRP. The complexity of project site physical processes, extent of dredging, and strict regulatory requirements on the clean-up action necessitated an innovative engineering approach to all above elements of the project. The approach also included application of the most advanced coastal engineering modeling tools including wave, tidal flow, sediment transport and stability, and coastal geomorphology hydrodynamic simulators. Based on analysis of the numerical modeling results, optimal engineering decisions were made for design and construction of detached breakwaters, dredging and removing a portion of the contaminated sediment, capping of the remaining contaminated sediment, and removing the old deteriorating creosoted sheetpile wall breakwater. Also, the results of the study determined the possibility of creating a sheltered eelgrass habitat and year-round small craft facility for different types of activities such as fishing, kayaking, and sailing.
Port of Anacortes Former Scott Paper Mill Cleanup Project
Hyde, B. (Autor:in) / Horine, A. (Autor:in) / Johnson, C. (Autor:in) / Phillips, S. (Autor:in) / Shepsis, V. (Autor:in)
Proceedings of Ports '13: 13th Triennial International Conference ; 2013 ; Seattle, Washington
Ports 2013 ; 139-147
12.08.2013
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Port of Anacortes Former Scott Paper Mill Clean-Up: Innovative Solution and Challenges
British Library Conference Proceedings | 2010
|Port of Olympia -- Cascade Pole Superfund Cleanup Project
Online Contents | 2002
New paper mill at Port Arthur, Ont
Engineering Index Backfile | 1928
|British Library Conference Proceedings | 1998
|