Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Victory Once More
An aging swing bridge in New Jersey has been replaced with a twin concrete box girder crossing that sets a U.S. record for span length using matchcast concrete segments. By using a carefully staged construction sequence, the first of the parallel structures was built adjacent to the existing bridge in just 15 months. Superstructure erection of the remaining crossing is on track to be completed in just 9 months.
Victory Once More
An aging swing bridge in New Jersey has been replaced with a twin concrete box girder crossing that sets a U.S. record for span length using matchcast concrete segments. By using a carefully staged construction sequence, the first of the parallel structures was built adjacent to the existing bridge in just 15 months. Superstructure erection of the remaining crossing is on track to be completed in just 9 months.
Victory Once More
Rodriguez, Jose M. (Autor:in) / Kasbekar, Nat B. (Autor:in)
Civil Engineering Magazine Archive ; 75 ; 50-57
01.01.2016
82005-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
British Library Online Contents | 2005
|Wiley | 1986
|Once more -- Problems of roadway dams
Engineering Index Backfile | 1966
|Great and honourable orphanhood, once more
British Library Online Contents | 1997
|Readymade Redux: Once More the Jewish Museum
Online Contents | 2002
|