Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction Information Systems in Romania
Management of construction calls for the manipulation of large amounts of data. In Romania, project description takes as many as 40,000 estimate items and specification of 80,000-1,000,000 material types. In order to handle large volumes of data, the Center for Cybernetics in Construction at Bucharest has developed a processing system called SICOP. This system is used by the Industrial Construction Ministry to process information regarding projects from concept stage to plant start-up. The paper describes the SICOP subsystems with emphasis on the PLU system which is used for work task definition and coordination.
Construction Information Systems in Romania
Management of construction calls for the manipulation of large amounts of data. In Romania, project description takes as many as 40,000 estimate items and specification of 80,000-1,000,000 material types. In order to handle large volumes of data, the Center for Cybernetics in Construction at Bucharest has developed a processing system called SICOP. This system is used by the Industrial Construction Ministry to process information regarding projects from concept stage to plant start-up. The paper describes the SICOP subsystems with emphasis on the PLU system which is used for work task definition and coordination.
Construction Information Systems in Romania
Halpin, Daniel W. (Autor:in) / Tutos, Nicolai (Autor:in)
Journal of the Construction Division ; 102 ; 335-345
01.01.2021
111976-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Structure of Construction Industry in Romania
ASCE | 2021
|A New Suspension Bridge Under Construction in Romania
British Library Conference Proceedings | 2000
|The First Construction with Reinforced Concrete Structure in Romania
Springer Verlag | 2023
|Best practices in industrial floor construction in Romania - CEI report
Online Contents | 2008