OPTIMALISASI PROPORSI SUMBER DAYA PROYEK DALAM MENEKAN BIAYA PROYEK KONSTRUKSI
AbstractThe construction of a building project is carried out through a specific project management system. The success rate of a project can be seen from the amount of cost efficiency, short time and the exact quality of the product achieved. In carrying out construction, the cost factor is a major consideration because it involves a large amount of investment that must be invested by contractors who are vulnerable to the risk of failure. This study intends to identify and analyze several variables that can affect the appropriateness of the proportion of resources, where modeling will then be carried out to calculate the appropriate proportion of resources and their influence in the implementation of a construction. This target can be realized through the following research objectives; Knowing the relationship between several possible variables to have an influence on the proportion of resources, then identifying how much influence it has and knowing the factors and effects of the use of the proportion of costs for construction project resources according to conditions in the field. From the results of a partial analysis of each resource, it shows that in the type of simple building construction, the most influential on the three proportions of resources is the building area variable; The influence of factors related to the financing of the results of a partial analysis on each resource, shows that in the type of simple building construction, the most influential on the three proportions of resources is the building area variable. on material resources so that the proportion of material resources needs to be calculated by taking into account the amount of escalation due to the increase in inflation.Keywords: Efficiency, Construction, Optimization, Project Resources
OPTIMALISASI PROPORSI SUMBER DAYA PROYEK DALAM MENEKAN BIAYA PROYEK KONSTRUKSI
AbstractThe construction of a building project is carried out through a specific project management system. The success rate of a project can be seen from the amount of cost efficiency, short time and the exact quality of the product achieved. In carrying out construction, the cost factor is a major consideration because it involves a large amount of investment that must be invested by contractors who are vulnerable to the risk of failure. This study intends to identify and analyze several variables that can affect the appropriateness of the proportion of resources, where modeling will then be carried out to calculate the appropriate proportion of resources and their influence in the implementation of a construction. This target can be realized through the following research objectives; Knowing the relationship between several possible variables to have an influence on the proportion of resources, then identifying how much influence it has and knowing the factors and effects of the use of the proportion of costs for construction project resources according to conditions in the field. From the results of a partial analysis of each resource, it shows that in the type of simple building construction, the most influential on the three proportions of resources is the building area variable; The influence of factors related to the financing of the results of a partial analysis on each resource, shows that in the type of simple building construction, the most influential on the three proportions of resources is the building area variable. on material resources so that the proportion of material resources needs to be calculated by taking into account the amount of escalation due to the increase in inflation.Keywords: Efficiency, Construction, Optimization, Project Resources
OPTIMALISASI PROPORSI SUMBER DAYA PROYEK DALAM MENEKAN BIAYA PROYEK KONSTRUKSI
Kholiq, Abdul (Autor:in) / Nurjamilah, Lia Lailla (Autor:in) / Rijaluddin, Arief (Autor:in)
19.01.2021
doi:10.31949/j-ensitec.v7i01.2874
J-ENSITEC; Vol 7, No 01 (2020): NOVEMBER 2020 ; 2477-359X ; 10.31949/j-ensitec.v7i01
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
PENGARUH KINERJA SUMBER DAYA MANUSIA TERHADAP KINERJA PROYEK KONSTRUKSI DI KABUPATEN BADUNG
DOAJ | 2020
|PENGARUH KINERJA SUMBER DAYA MANUSIA TERHADAP KINERJA PROYEK KONSTRUKSI DI KABUPATEN BADUNG
BASE | 2020
|