Assessment of Delay Factors in Saudi Arabia Railway/Metro Construction Projects
Railway construction industry has devoted vast amount of resources into advancing the management and technology of railway construction, yet most project in this industry often failed to comply with the set deadlines and budget limits. This study was conducted to recognize the critical factors that are causing delays in the construction of Riyadh Metro project, Saudi Arabia. From a thorough literature review, thirty-six (36) factors causing delays were identified which were then distributed to qualified industry experts in a survey questionnaire. A total of 105 respondents were gathered during the data collection. The data was then evaluated statistically by utilizing different calculation tools that are frequency adjusted importance index for the delay factor ranking, and Spearman's correlation coefficient for the link between two different set of data. The result of this research identified the top five main delay factors to the railway construction projects which are “Client's decision-making process and changes in control procedures”, “Design Errors (including ambiguities and discrepancies of details/specifications)”, “Labor skills level”, “Design changes by Client or Consultant” and lastly, “Issues regarding permissions/ approvals from other stakeholders”. Finally, this study is hoped to help the railway construction industry in bettering itself by highlighting which issues should be focused on to counter the delays and reduce downtimes.
Assessment of Delay Factors in Saudi Arabia Railway/Metro Construction Projects
Railway construction industry has devoted vast amount of resources into advancing the management and technology of railway construction, yet most project in this industry often failed to comply with the set deadlines and budget limits. This study was conducted to recognize the critical factors that are causing delays in the construction of Riyadh Metro project, Saudi Arabia. From a thorough literature review, thirty-six (36) factors causing delays were identified which were then distributed to qualified industry experts in a survey questionnaire. A total of 105 respondents were gathered during the data collection. The data was then evaluated statistically by utilizing different calculation tools that are frequency adjusted importance index for the delay factor ranking, and Spearman's correlation coefficient for the link between two different set of data. The result of this research identified the top five main delay factors to the railway construction projects which are “Client's decision-making process and changes in control procedures”, “Design Errors (including ambiguities and discrepancies of details/specifications)”, “Labor skills level”, “Design changes by Client or Consultant” and lastly, “Issues regarding permissions/ approvals from other stakeholders”. Finally, this study is hoped to help the railway construction industry in bettering itself by highlighting which issues should be focused on to counter the delays and reduce downtimes.
Assessment of Delay Factors in Saudi Arabia Railway/Metro Construction Projects
Mohammed Gopang, Raja Khan (Autor:in) / alias Imran, Qadir Bux (Autor:in) / Nagapan, Sasitharan (Autor:in)
25.10.2020
International Journal of Sustainable Construction Engineering and Technology; Vol 11 No 2 (2020): Special Issue 2020: Sustainable Approach; 225-233 ; 2600-7959 ; 2180-3242
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Factors Affecting Contractors’ Bidding Decisions for Construction Projects in Saudi Arabia
DOAJ | 2019
|Impact assessment of critical success factors (CSFs) in public construction projects of Saudi Arabia
DOAJ | 2024
|A Review on Significant Factors Causing Delays in Saudi Arabia Construction Projects
DOAJ | 2022
|Preliminary Study of Risk Factors in Marine Construction Projects in Saudi Arabia
BASE | 2019
|Value engineering in public construction projects in Saudi Arabia
British Library Online Contents | 1996
|