Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Preliminary Study of Risk Factors in Marine Construction Projects in Saudi Arabia
Marine-construction projects are becoming increasingly important for the development of the maritime industry. However, such increases are hampered by various risks that can significantly impact growth. Natural forces, political events, administrative and operational mistakes, equipment failures, external attacks such as arson, and economic events are some of the major risks faced by firms in this industry. Researchers have paid little attention to marine-construction risk assessment, despite the importance of such research. This study sought to investigate risks associated with marine construction projects. A questionnaire survey tool was conducted in this study targeting expertise in Saudi Arabian marine-construction industry resulting in a response rate of 62.5%. Participants were asked to rate the occurrences and impacts on project’ safety, schedule, and cost of 37 identified marine construction risk factors. Reliability of gathered data, correlation among the variables, and risk score analyses were performed in this study. The findings of this study indicated that “Unskilled Contractor Labor” had the highest risk scores on marine-construction projects. The study recommends that the marine-construction industry should conduct additional studies to investigate and evaluate risks aspects.
Preliminary Study of Risk Factors in Marine Construction Projects in Saudi Arabia
Marine-construction projects are becoming increasingly important for the development of the maritime industry. However, such increases are hampered by various risks that can significantly impact growth. Natural forces, political events, administrative and operational mistakes, equipment failures, external attacks such as arson, and economic events are some of the major risks faced by firms in this industry. Researchers have paid little attention to marine-construction risk assessment, despite the importance of such research. This study sought to investigate risks associated with marine construction projects. A questionnaire survey tool was conducted in this study targeting expertise in Saudi Arabian marine-construction industry resulting in a response rate of 62.5%. Participants were asked to rate the occurrences and impacts on project’ safety, schedule, and cost of 37 identified marine construction risk factors. Reliability of gathered data, correlation among the variables, and risk score analyses were performed in this study. The findings of this study indicated that “Unskilled Contractor Labor” had the highest risk scores on marine-construction projects. The study recommends that the marine-construction industry should conduct additional studies to investigate and evaluate risks aspects.
Preliminary Study of Risk Factors in Marine Construction Projects in Saudi Arabia
Alansari, Abdulrahman (Autor:in) / Nguyen, Tang-Hung (Autor:in)
19.06.2019
International Journal of Sciences: Basic and Applied Research (IJSBAR); Vol 47 No 1 (2019); 99-116 ; 2307-4531
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
Factors Affecting Contractors’ Bidding Decisions for Construction Projects in Saudi Arabia
DOAJ | 2019
|Assessment of Delay Factors in Saudi Arabia Railway/Metro Construction Projects
BASE | 2020
|A Review on Significant Factors Causing Delays in Saudi Arabia Construction Projects
DOAJ | 2022
|Challenging Tendering-Phase Factors in Public Construction Projects—A Delphi Study in Saudi Arabia
DOAJ | 2022
|Value engineering in public construction projects in Saudi Arabia
British Library Online Contents | 1996
|