Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Studi Proyeksi Kebutuhan Fasilitas Sisi Darat Dan Pengembangan Kota Bandar Udara Ahmad Yani Di Kota Semarang
Ahmad Yani Airport that located in Semarang City is the gateway and transit point for the cities around Semarang. These things made number of passengers and goods are increasing in the Ahmad Yani Airport. The existence Obstacle of Limitation Surfaces on Ahmad Yani Airport did not obstruct the city and the building development therefore it can be built around the airport. The passenger and goods growth rate development Ahmad Yani Airport are not matched by the infrastructure and non-flight facilities growth. In the result of it, there are deficiencies of landside facilities and airport support facilities as a central air transportation. OLS existence is still regarded as a obstruct city growth. This study uses quantitative methods by projection analysis of passengers and flight flow data in previous years. The results are used to find the range of the airport number of passengers and airport facilities volume requirements in the future. The results showed that the rush hour number of passengers at Ahmad Yani Airport is 2864 people and the sum total of passengers per year 57,727,482 in 2035. Terminal area needs a minimum of 12,626 m2 and 38,556 m2 of parking area. The Ahmad Yani Airport required the most supporting room facilities, such as; concession airport room, parking area, pedestrian path, airport hotel, and followed by other facilities. Superimpose and normative analysis showed that the potential placement for the new airport facilities is on the north Ahmad Yani Airport runway.
Studi Proyeksi Kebutuhan Fasilitas Sisi Darat Dan Pengembangan Kota Bandar Udara Ahmad Yani Di Kota Semarang
Ahmad Yani Airport that located in Semarang City is the gateway and transit point for the cities around Semarang. These things made number of passengers and goods are increasing in the Ahmad Yani Airport. The existence Obstacle of Limitation Surfaces on Ahmad Yani Airport did not obstruct the city and the building development therefore it can be built around the airport. The passenger and goods growth rate development Ahmad Yani Airport are not matched by the infrastructure and non-flight facilities growth. In the result of it, there are deficiencies of landside facilities and airport support facilities as a central air transportation. OLS existence is still regarded as a obstruct city growth. This study uses quantitative methods by projection analysis of passengers and flight flow data in previous years. The results are used to find the range of the airport number of passengers and airport facilities volume requirements in the future. The results showed that the rush hour number of passengers at Ahmad Yani Airport is 2864 people and the sum total of passengers per year 57,727,482 in 2035. Terminal area needs a minimum of 12,626 m2 and 38,556 m2 of parking area. The Ahmad Yani Airport required the most supporting room facilities, such as; concession airport room, parking area, pedestrian path, airport hotel, and followed by other facilities. Superimpose and normative analysis showed that the potential placement for the new airport facilities is on the north Ahmad Yani Airport runway.
Studi Proyeksi Kebutuhan Fasilitas Sisi Darat Dan Pengembangan Kota Bandar Udara Ahmad Yani Di Kota Semarang
Pindyandito Surya Wikrana Putra (Autor:in)
2017
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Evaluasi Fasilitas Sisi Darat Bandara Sultan Thaha Jambi Sebagai Bandar Udara Internasional
DOAJ | 2011
|PERKEMBANGAN PEMANFAATAN LAHAN DI KAWASAN SEKITAR BANDAR UDARA AHMAD YANI SEMARANG
DOAJ | 2020
|ANALISIS PROYEKSI PERTUMBUHAN PENDUDUK DAN KEBUTUHAN FASILITAS PERSAMPAHAN DI KOTA PALU 2015-2025
BASE | 2016
|Pengembangan Sisi Udara Bandar Udara Nunukan sebagai Bandar Udara untuk Pertahanan Nasional
DOAJ | 2014
|Evaluasi Pelayanan Peralatan Keselamatan Penerbangan, Bandar Udara Achmad Yani- Semarang
DOAJ | 2007
|