Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
IN-SITU TEST EXPERIMENTAL RESEARCH ON LEAKAGE OF LARGE DIAMETER PRE-STRESSED CONCRETE CYLINDER PIPE (PCCP)
In recent years, a big number of large diameter pre-stressed concrete cylinder pipe (PCCP) lines have been applied to the Mid-route of the South-to-North Water Transfer Project. However, the leakage problem of PCCP causes annually heavy economic losses to our country. In such a context of situation, how to detect leaks rapidly and precisely after pipes appear cracks in water supply system has great significance. Based on the study and analysis of the characteristic structure of large diameter PCCP, a new leak detection system using fiber Bragg grating sensors, which can capture signals of water pressure change, is proposed. The feasibility, reliability and practicability of the system could be acceptable according to data achieved from in–situ tests. Moreover, the leak detection system can monitor in real-time of dynamic change of water pressure. The equations of the leakage quantity and water pressure have been presented in this paper, which can provide technical guidelines for large diameter PCCP lines maintenance.
IN-SITU TEST EXPERIMENTAL RESEARCH ON LEAKAGE OF LARGE DIAMETER PRE-STRESSED CONCRETE CYLINDER PIPE (PCCP)
In recent years, a big number of large diameter pre-stressed concrete cylinder pipe (PCCP) lines have been applied to the Mid-route of the South-to-North Water Transfer Project. However, the leakage problem of PCCP causes annually heavy economic losses to our country. In such a context of situation, how to detect leaks rapidly and precisely after pipes appear cracks in water supply system has great significance. Based on the study and analysis of the characteristic structure of large diameter PCCP, a new leak detection system using fiber Bragg grating sensors, which can capture signals of water pressure change, is proposed. The feasibility, reliability and practicability of the system could be acceptable according to data achieved from in–situ tests. Moreover, the leak detection system can monitor in real-time of dynamic change of water pressure. The equations of the leakage quantity and water pressure have been presented in this paper, which can provide technical guidelines for large diameter PCCP lines maintenance.
IN-SITU TEST EXPERIMENTAL RESEARCH ON LEAKAGE OF LARGE DIAMETER PRE-STRESSED CONCRETE CYLINDER PIPE (PCCP)
Jianjun Luo (Autor:in) / Liping Gao (Autor:in)
2016
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Mechanical Capacity Analysis of Large Diameter Prestressed Concrete Cylinder Pipe (PCCP)
British Library Conference Proceedings | 2012
|Large-diameter PCCP (prestressed concrete cylinder pipe) joint grouting and trowelling device
Europäisches Patentamt | 2024
|PCCP (prestressed concrete cylinder pipe) concrete base template supporting system
Europäisches Patentamt | 2024
|