Modification of Peck Formula to Predict Surface Settlement of Tunnel Construction in Water-Rich Sandy Cobble Strata and Its Program Implementation
There are few studies on the land subsidence induced by shield tunneling in the water-rich sandy gravel stratum, which is of high research value. Linear regression and measured data were employed in this study to investigate the land subsidence induced by shield tunneling when crossing the water-rich sandy gravel stratum from Mudan Dadao Station to Longmen Dadao station of Luoyang Metro Line 2. The maximum land subsidence correction coefficient, α, and the settlement trough width correction coefficient, β, were introduced to modify the peck formula to predict land subsidence induced by shield tunneling in Luoyang’s water-rich sandy gravel stratum. It was discovered that the original Peck formula needs to be modified because its prediction result was significantly larger than the actual value. When the value ranges of α and β in the modified Peck formula were 0.379~0.690 and 0.455~0.508, respectively, the modified Peck formula presented a minor error, in terms of the prediction curve, compared with the original formula, and the prediction result was more reliable. The best prediction result could be obtained when α = 0.535 and β = 0.482. In addition, Python could effectively improve the calculation efficiency of the Peck formula modification.
Modification of Peck Formula to Predict Surface Settlement of Tunnel Construction in Water-Rich Sandy Cobble Strata and Its Program Implementation
There are few studies on the land subsidence induced by shield tunneling in the water-rich sandy gravel stratum, which is of high research value. Linear regression and measured data were employed in this study to investigate the land subsidence induced by shield tunneling when crossing the water-rich sandy gravel stratum from Mudan Dadao Station to Longmen Dadao station of Luoyang Metro Line 2. The maximum land subsidence correction coefficient, α, and the settlement trough width correction coefficient, β, were introduced to modify the peck formula to predict land subsidence induced by shield tunneling in Luoyang’s water-rich sandy gravel stratum. It was discovered that the original Peck formula needs to be modified because its prediction result was significantly larger than the actual value. When the value ranges of α and β in the modified Peck formula were 0.379~0.690 and 0.455~0.508, respectively, the modified Peck formula presented a minor error, in terms of the prediction curve, compared with the original formula, and the prediction result was more reliable. The best prediction result could be obtained when α = 0.535 and β = 0.482. In addition, Python could effectively improve the calculation efficiency of the Peck formula modification.
Modification of Peck Formula to Predict Surface Settlement of Tunnel Construction in Water-Rich Sandy Cobble Strata and Its Program Implementation
Yanxia Gao (Autor:in) / Yiwen Liu (Autor:in) / Pengju Tang (Autor:in) / Chunqiao Mi (Autor:in)
2022
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Surface Settlement Induced by Slurry Shield Tunnelling in Sandy Cobble Strata—A Case Study
Springer Verlag | 2021
|Surface Settlement Induced by Subway Tunnel Construction Based on Modified Peck Formula
Online Contents | 2019
|Surface Settlement Induced by Subway Tunnel Construction Based on Modified Peck Formula
Online Contents | 2019
|Prediction Model for Disc Cutter Wear of Tunnel Boring Machines in Sandy Cobble Strata
Springer Verlag | 2020
|