Analysis of Influence Law of Burial Depth on Surrounding Rock Deformation of Roadway
In order to study the influence of burial depth on the roadway deformation, the deformation data of more than 100 roadways were collected and classified. The results have shown that, in the first 5 days of new digging roadways, the surrounding rock deformation is basically not affected by the buried depth. The influence period of roadway deformation with different depths is the same, namely, the severe period (1∼15 days), the mitigation period (15∼35 days), and the stable period (35∼50 days). With the increase in depth, the surrounding rock deformation increment of new digging roadways with a depth of 300∼600 m is much larger than that of 600∼900 m. Within 100 m of the working face from the monitoring point, the deformation of mining roadways can be divided into two stages: severe impact (10∼60 m) and stable impact (60∼100 m). With the increase in depth, the deformation increment of the surrounding rock in the mining roadways with a depth of 600∼900 m is much larger than that of 300∼600 m. The surrounding rock deformation increases with the increase in the width and height of roadways and gradually increases with the decrease in the strength of rock mass.
Analysis of Influence Law of Burial Depth on Surrounding Rock Deformation of Roadway
In order to study the influence of burial depth on the roadway deformation, the deformation data of more than 100 roadways were collected and classified. The results have shown that, in the first 5 days of new digging roadways, the surrounding rock deformation is basically not affected by the buried depth. The influence period of roadway deformation with different depths is the same, namely, the severe period (1∼15 days), the mitigation period (15∼35 days), and the stable period (35∼50 days). With the increase in depth, the surrounding rock deformation increment of new digging roadways with a depth of 300∼600 m is much larger than that of 600∼900 m. Within 100 m of the working face from the monitoring point, the deformation of mining roadways can be divided into two stages: severe impact (10∼60 m) and stable impact (60∼100 m). With the increase in depth, the deformation increment of the surrounding rock in the mining roadways with a depth of 600∼900 m is much larger than that of 300∼600 m. The surrounding rock deformation increases with the increase in the width and height of roadways and gradually increases with the decrease in the strength of rock mass.
Analysis of Influence Law of Burial Depth on Surrounding Rock Deformation of Roadway
Hai Wu (Autor:in) / Xiaokang Wang (Autor:in) / Weijian Yu (Autor:in) / Weijun Wang (Autor:in) / Zizheng Zhang (Autor:in) / Gang Peng (Autor:in)
2020
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Method for repairing large-burial-depth rock burst mine roadway
Europäisches Patentamt | 2020
|Numerical Analysis and Control Study on Surrounding Rock Deformation of Deep Soft Rock Roadway
DOAJ | 2021
|Study on Deformation Characteristics of Surrounding Rock of Roadway with Coal–Rock Interface
DOAJ | 2023
|Soft rock roadway surrounding rock stability monitoring device
Europäisches Patentamt | 2024
|Surrounding Rock Deformation Properties and Control Technique for Roadway along Goaf in Soft Rock
Trans Tech Publications | 2014
|