Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Contractor fabricates equipment to speed construction of 90-mile welded gas pipeline
Illustrated description of construction of pipeline from La Goleta oil fields to Los Angeles to carry natural gas in either direction under pressures up to 1000 psi; clearing right of way; welding; excavating trench; backfilling; crossing canyons and rivers. (p 64-6, 168, 172, 174)
Contractor fabricates equipment to speed construction of 90-mile welded gas pipeline
Illustrated description of construction of pipeline from La Goleta oil fields to Los Angeles to carry natural gas in either direction under pressures up to 1000 psi; clearing right of way; welding; excavating trench; backfilling; crossing canyons and rivers. (p 64-6, 168, 172, 174)
Contractor fabricates equipment to speed construction of 90-mile welded gas pipeline
Construction Methods
1945
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New Developmental Process Rapidly Fabricates Complex Metal Components for Commercial Applications
British Library Online Contents | 1998
EVERYTHING POSSIBLE Contractor goes the extra mile to win illustrious Hayes Award
British Library Online Contents | 2008
Laser aligns 9-mile submarine pipeline
Engineering Index Backfile | 1968
Arrow energy to build 360-mile pipeline
Online Contents | 2014
Construction: Contractor Submittal Procedures
NTIS | 1997