Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Superstructure mainly of electrically welded steel girder construction; aluminum killed St52 steel employed; construction details including welding; static and laboratory tests. (See also - n 10 Oct 1955 p 217-23)
Superstructure mainly of electrically welded steel girder construction; aluminum killed St52 steel employed; construction details including welding; static and laboratory tests. (See also - n 10 Oct 1955 p 217-23)
Reconstruction of Kaiser railway bridge over Rhine near Mainz
Der Wiederaufbau der Kaiserbruecke bei Mainz
Goerg, P. (Autor:in)
Stahlbau ; 24
1955
8 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Railway bridge over Rhine at Spyck
Engineering Index Backfile | 1945
Reconstruction of bridge over Rhine River
Engineering Index Backfile | 1952
|Tidal basin bridge of Rhine bridge at Mainz-Weisenau
Engineering Index Backfile | 1962
|Reconstruction of road bridge over Rhine
Engineering Index Backfile | 1956
|The railway bridge over the Rhine at Worms
Engineering Index Backfile | 1900
|