Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Details of statically determinate structure; superstructure is built in separate sections whose height can be varied; design of shear resistant connections using "Peco stud welding process" and "Philips stud welding process"; cost comparison of both methods; fabrication and erection of steel structure.
Details of statically determinate structure; superstructure is built in separate sections whose height can be varied; design of shear resistant connections using "Peco stud welding process" and "Philips stud welding process"; cost comparison of both methods; fabrication and erection of steel structure.
Tidal basin bridge of Rhine bridge at Mainz-Weisenau
Die Flutbettbruecke der Rheinbruecke bei Mainz-Weisenau
Roik, K. (Autor:in)
Stahlbau ; 31
1962
10 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of Kaiser railway bridge over Rhine near Mainz
Engineering Index Backfile | 1955
|Engineering Index Backfile | 1945
Engineering Index Backfile | 1946
|Building Patton's Rhine river bridge
Engineering Index Backfile | 1948
|Widening Rhine bridge at Dusseldorf
Engineering Index Backfile | 1925
|