Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Perak river hydro-electric power scheme
Design and construction of hydroelectric power development of about 27,000 kw including construction of hollow reinforcedconcrete overflow dam about 70 ft high.
Perak river hydro-electric power scheme
Design and construction of hydroelectric power development of about 27,000 kw including construction of hollow reinforcedconcrete overflow dam about 70 ft high.
Perak river hydro-electric power scheme
Instn Civ Engrs -- Min Proc
Hellstrom, B.M. (Autor:in)
1934
60 pages
2 Supp plates
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Chenderoh water-power plant of Perak river hydro-electric' power scheme
Engineering Index Backfile | 1935
|Construction of Chenderoh water-power plant of Perak river hydro-electric' power scheme
Engineering Index Backfile | 1934
|Upper Perak Hydroelectric Scheme Dam Surveillance Aspect
British Library Conference Proceedings | 2002
|Sector sluice gate for the Perak river
Engineering Index Backfile | 1929
Kariba hydro-electric scheme on Zambesi river
Engineering Index Backfile | 1956