Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Chenderoh water-power plant of Perak river hydro-electric' power scheme
Design and construction of hydroelectric power plant including earth-fill dam about 30 ft high and suspension bridge of 450 ft span; malaria control. (see also Engineering v 139 n 3599 Jan 4 1935 p 8-9)
Construction of Chenderoh water-power plant of Perak river hydro-electric' power scheme
Design and construction of hydroelectric power plant including earth-fill dam about 30 ft high and suspension bridge of 450 ft span; malaria control. (see also Engineering v 139 n 3599 Jan 4 1935 p 8-9)
Construction of Chenderoh water-power plant of Perak river hydro-electric' power scheme
Instn Civ Engrs -- Min Proc
Rennie, W.J.H. (Autor:in)
1934
43 pages
Supp plate
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Perak river hydro-electric power scheme
Engineering Index Backfile | 1934
|Construction of Chenderoh water-power plant of Perak river hydro-electric' power scheme
Engineering Index Backfile | 1935
|Krangede hydro-electric power scheme
Engineering Index Backfile | 1938
Shannon hydro-electric power scheme
Engineering Index Backfile | 1928
Grampian hydro-electric power scheme
Engineering Index Backfile | 1931