Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction, subsidence and repair of san gabriel dam no. 2
Rock-fill dam, 265 ft high, settled 12 ft following torrential rain; concrete facing damaged; consulting board recommends repairs with temporary timber facing; reconstruction described. (See also - n 10 Mar 7 1935 p 343-5, n 13 discussions Mar 28 p 461)
Construction, subsidence and repair of san gabriel dam no. 2
Rock-fill dam, 265 ft high, settled 12 ft following torrential rain; concrete facing damaged; consulting board recommends repairs with temporary timber facing; reconstruction described. (See also - n 10 Mar 7 1935 p 343-5, n 13 discussions Mar 28 p 461)
Construction, subsidence and repair of san gabriel dam no. 2
Eng News-Rec
Engineering News-Record ; 114
1935
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 1968
|Gabriel Goes Gold - Gabriel Poole's medal-winning career
Online Contents | 1998
Gabriel Goes Gold: Gabriel Poole's medal-winning career
British Library Online Contents | 1998
Prediction of subsidence during tunnel construction
British Library Conference Proceedings | 2007
|