A platform for research: civil engineering, architecture and urbanism
Construction, subsidence and repair of san gabriel dam no. 2
Rock-fill dam, 265 ft high, settled 12 ft following torrential rain; concrete facing damaged; consulting board recommends repairs with temporary timber facing; reconstruction described. (See also - n 10 Mar 7 1935 p 343-5, n 13 discussions Mar 28 p 461)
Construction, subsidence and repair of san gabriel dam no. 2
Rock-fill dam, 265 ft high, settled 12 ft following torrential rain; concrete facing damaged; consulting board recommends repairs with temporary timber facing; reconstruction described. (See also - n 10 Mar 7 1935 p 343-5, n 13 discussions Mar 28 p 461)
Construction, subsidence and repair of san gabriel dam no. 2
Eng News-Rec
Engineering News-Record ; 114
1935
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Gabriel Goes Gold: Gabriel Poole's medal-winning career
British Library Online Contents | 1998
TIBKAT | 1968
|Gabriel Goes Gold - Gabriel Poole's medal-winning career
Online Contents | 1998
Design and construction of San Gabriel dam no. 1
Engineering Index Backfile | 1941
|