Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Wheeler dam construction enters final year
Review of construction methods and progress in excavating 550,000 cu yd of rock and placing 650,000 cu yd of concrete in building dam 11/4 mi long on Tennessee River; grouting of foundation; dredging concrete materials.
Wheeler dam construction enters final year
Review of construction methods and progress in excavating 550,000 cu yd of rock and placing 650,000 cu yd of concrete in building dam 11/4 mi long on Tennessee River; grouting of foundation; dredging concrete materials.
Wheeler dam construction enters final year
Eng News-Rec
Engineering News-Record ; 115
1935
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
|Online Contents | 2003
Russian Rail Revolution enters final phase
IuD Bahn | 2006
|Diesel enters subway construction
Engineering Index Backfile | 1938
Aluminum enters bridge construction
Engineering Index Backfile | 1933
|