Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reconstruction of Smithfield St. Bridge, in Pittsburgh, which was considered obsolete for modern traffic conditions, by replacing old steel and timber floor with new floor of high-strength aluminum alloy; aluminum-alloy floor framing and ribbed slab surfaced with asphaltic concrete, reducing dead load by more than 1 ton per lin ft; floor slab under load test; costs.
Reconstruction of Smithfield St. Bridge, in Pittsburgh, which was considered obsolete for modern traffic conditions, by replacing old steel and timber floor with new floor of high-strength aluminum alloy; aluminum-alloy floor framing and ribbed slab surfaced with asphaltic concrete, reducing dead load by more than 1 ton per lin ft; floor slab under load test; costs.
Aluminum enters bridge construction
Eng News-Rec
Reppert, C.M. (Autor:in)
Engineering News-Record ; 111
1933
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Diesel enters subway construction
Engineering Index Backfile | 1938
Environmental Performance Enters Construction Materials
British Library Online Contents | 2008
|Wheeler dam construction enters final year
Engineering Index Backfile | 1935
Stainless steel "lumber" enters construction field
Engineering Index Backfile | 1939
Aluminum in bridge construction
Engineering Index Backfile | 1956
|